1. <sub id="zy88n"></sub>
        1. <blockquote id="zy88n"></blockquote>
          欧美黑人又大又粗xxxxx,人人爽久久久噜人人看,扒开双腿吃奶呻吟做受视频,中国少妇人妻xxxxx,2021国产在线视频,日韩福利片午夜免费观着,特黄aaaaaaa片免费视频,亚洲综合日韩av在线
           
          Feature: China's drilling company brings water to Egypt's desert for future giant sugar factory
                           Source: Xinhua | 2018-11-24 20:37:49 | Editor: huaxia

          Water bursts out from the well dug by China's ZPEC drilling company in the Western Desert near Egypt's southern province of Minya, on Nov. 20, 2018. (Xinhua/Li Binian)

          MINYA, Egypt, Nov. 24 (Xinhua) -- People were all with smiles while seeing water massively running out of a 500-horsepower pump to cover a pool of sand in the middle of vast desert.

          It was during one of the pumping tests for a well dug by China's ZPEC drilling company in the Western Desert near Egypt's southern province of Minya.

          Producing from 600 to 750 cubic meters of water per hour, the well is one of 30 wells drilled by ZPEC as an initial stage of locating and digging 300 wells to facilitate reclamation of some 120,000 feddans for growing millions of tons of sugar beets.

          The sugar beets are planned to be supplied to a sugar factory that will be built on the outskirts of Minya and is expected to be the largest in Africa and the Middle East, through a partnership between Jamal Al Ghurair Group, owner of Canal Sugar, a giant sugar producer and exporter from the United Arab Emirates (UAE), and Egypt's Al Ahly Capital Holding, the investment arm of the National Bank of Egypt.

          ZPEC uses three 40-meter-tall 650-horsepower drilling rigs and other heavy equipments including cranes, tractors, power generators, trucks and vehicles in different locations in the desert, some 50 km western Mallawi district of Minya, to accomplish the project which was started in June and will be finished in two years.

          Li Wei, general manager of ZPEC branch in Egypt, said that the company has 11 rigs in Egypt and it plans to bring more of them to join the Canal Sugar project.

          "I am very proud of working as a contractor for this huge project. Our deadline is around two years and a half, but I am sure we will complete this project ahead of time," Li told Xinhua near one of the working rigs in the desert.

          Water from the well dug by China's ZPEC drilling company massively run out of a 500-horsepower pump to cover a pool of sand in the Western Desert near Egypt's southern province of Minya, on Nov. 20, 2018. (Xinhua/Li Binian)

          Since 2016, ZPEC has worked in Egypt's 1.5-million-feddan reclamation national project and drilled 38 agricultural wells for the Egyptian military in the Sinai Peninsula.

          Li said that growing Chinese-Egyptian ties and partnerships are behind the increasing number of Chinese companies and businesses operating in Egypt.

          Ross Grier, estate manager for Canal Sugar project in Minya, said that he was pleased with the operating wells drilled by ZPEC and that the results of the pumping tests were "a lot better than our expectations."

          Grier noted that the total investment in the sugar beet estate and the factory nearly reached one billion U.S. dollars, adding that the constructions will start in about six months and will hopefully be completed within 42 months.

          "The estate is going to be about 50,000 hectares. The area of the factory is about a hundred hectares and it will be the largest factory in the Middle East and possibly in the world, for it is going to run 36,000 tons of sugar beet per day," the estate manager said.

          The factory will run by February 2022 and it will require about 5.5 million tons of sugar beet per year, with an expected number of workers to be around 1,200 for the farm and 400 for the factory, he said.

          While the pumping test was passing successfully, one of the rigs appeared from a distance in another spot of the desert with a high fountain of water coming out of it and splashing in the air, reaching the top of the 35-m mast of the rig.

          Egyptian workers of China's ZPEC drilling company are seen during the pumping tests for a well in the Western Desert near Egypt's southern province of Minya, on Nov. 20, 2018. (Xinhua/Li Binian)

          "The first well we drilled took us more than a month due to the nature of this land, but now we can finish a well from scratch in week," ZPEC site operation manager Amir Mohamed told Xinhua near the giant rig, noting that ZPEC has about 200 workers on the site, mostly Egyptians.

          Everyone on the site, including managers, engineers, technicians and helpers wore ZPEC red overalls, white helmets and black safety shoes.

          The desistance between each of the first 30 wells is about six km, which needed to open up some roads in the desert to pave the way for moving rigs, power generators, pumps and other heavy equipment from well to well.

          "We use loaders, tractors, gliders and water trucks to open up some roads in the desert for ZPEC work. Our work is a must before the drilling process. We've finished about 120 km of six-meter wide roads to connect the first 30 wells and the project will need about 400 km of such roads in total," said Gamal Abdullah, a local subcontractor working for ZPEC in leveling roads and providing vehicles and equipment.

          "I have worked with many foreign companies of different nationalities and I have been working with ZPEC for about three years now and I can say it is really one of the best in terms of work system and drilling expertise," Abdullah said.

          Back to Top Close
          Xinhuanet

          Feature: China's drilling company brings water to Egypt's desert for future giant sugar factory

          Source: Xinhua 2018-11-24 20:37:49

          Water bursts out from the well dug by China's ZPEC drilling company in the Western Desert near Egypt's southern province of Minya, on Nov. 20, 2018. (Xinhua/Li Binian)

          MINYA, Egypt, Nov. 24 (Xinhua) -- People were all with smiles while seeing water massively running out of a 500-horsepower pump to cover a pool of sand in the middle of vast desert.

          It was during one of the pumping tests for a well dug by China's ZPEC drilling company in the Western Desert near Egypt's southern province of Minya.

          Producing from 600 to 750 cubic meters of water per hour, the well is one of 30 wells drilled by ZPEC as an initial stage of locating and digging 300 wells to facilitate reclamation of some 120,000 feddans for growing millions of tons of sugar beets.

          The sugar beets are planned to be supplied to a sugar factory that will be built on the outskirts of Minya and is expected to be the largest in Africa and the Middle East, through a partnership between Jamal Al Ghurair Group, owner of Canal Sugar, a giant sugar producer and exporter from the United Arab Emirates (UAE), and Egypt's Al Ahly Capital Holding, the investment arm of the National Bank of Egypt.

          ZPEC uses three 40-meter-tall 650-horsepower drilling rigs and other heavy equipments including cranes, tractors, power generators, trucks and vehicles in different locations in the desert, some 50 km western Mallawi district of Minya, to accomplish the project which was started in June and will be finished in two years.

          Li Wei, general manager of ZPEC branch in Egypt, said that the company has 11 rigs in Egypt and it plans to bring more of them to join the Canal Sugar project.

          "I am very proud of working as a contractor for this huge project. Our deadline is around two years and a half, but I am sure we will complete this project ahead of time," Li told Xinhua near one of the working rigs in the desert.

          Water from the well dug by China's ZPEC drilling company massively run out of a 500-horsepower pump to cover a pool of sand in the Western Desert near Egypt's southern province of Minya, on Nov. 20, 2018. (Xinhua/Li Binian)

          Since 2016, ZPEC has worked in Egypt's 1.5-million-feddan reclamation national project and drilled 38 agricultural wells for the Egyptian military in the Sinai Peninsula.

          Li said that growing Chinese-Egyptian ties and partnerships are behind the increasing number of Chinese companies and businesses operating in Egypt.

          Ross Grier, estate manager for Canal Sugar project in Minya, said that he was pleased with the operating wells drilled by ZPEC and that the results of the pumping tests were "a lot better than our expectations."

          Grier noted that the total investment in the sugar beet estate and the factory nearly reached one billion U.S. dollars, adding that the constructions will start in about six months and will hopefully be completed within 42 months.

          "The estate is going to be about 50,000 hectares. The area of the factory is about a hundred hectares and it will be the largest factory in the Middle East and possibly in the world, for it is going to run 36,000 tons of sugar beet per day," the estate manager said.

          The factory will run by February 2022 and it will require about 5.5 million tons of sugar beet per year, with an expected number of workers to be around 1,200 for the farm and 400 for the factory, he said.

          While the pumping test was passing successfully, one of the rigs appeared from a distance in another spot of the desert with a high fountain of water coming out of it and splashing in the air, reaching the top of the 35-m mast of the rig.

          Egyptian workers of China's ZPEC drilling company are seen during the pumping tests for a well in the Western Desert near Egypt's southern province of Minya, on Nov. 20, 2018. (Xinhua/Li Binian)

          "The first well we drilled took us more than a month due to the nature of this land, but now we can finish a well from scratch in week," ZPEC site operation manager Amir Mohamed told Xinhua near the giant rig, noting that ZPEC has about 200 workers on the site, mostly Egyptians.

          Everyone on the site, including managers, engineers, technicians and helpers wore ZPEC red overalls, white helmets and black safety shoes.

          The desistance between each of the first 30 wells is about six km, which needed to open up some roads in the desert to pave the way for moving rigs, power generators, pumps and other heavy equipment from well to well.

          "We use loaders, tractors, gliders and water trucks to open up some roads in the desert for ZPEC work. Our work is a must before the drilling process. We've finished about 120 km of six-meter wide roads to connect the first 30 wells and the project will need about 400 km of such roads in total," said Gamal Abdullah, a local subcontractor working for ZPEC in leveling roads and providing vehicles and equipment.

          "I have worked with many foreign companies of different nationalities and I have been working with ZPEC for about three years now and I can say it is really one of the best in terms of work system and drilling expertise," Abdullah said.

          010020070750000000000000011100001376288701
          主站蜘蛛池模板: 国产精品一区久久av| 久久婷婷国产综合尤物精品| 久久精品成人免费看| 午夜精品久久久久久久无码软件| 亚洲欧美精品午睡沙发| 女人扒开腿让男人桶到爽| 久热综合在线亚洲精品| 在线一区二区三区视频观看| 免费无码一区二区三区蜜桃大| 疯狂做受xxxx高潮视频免费| 韩国美女av一区二区三区四区| 久视频免费精品6| 熟女系列丰满熟妇AV| 精品无码国产一区二区三区AV| 天堂av在线一区二区| 婷婷久久综合九色综合88| 亚洲精品午睡沙发系列| 苍井空无码丰满尖叫高潮| 伊人久久大香线焦av综合影院 | 欧美人人妻人人澡人人尤物| 人妻有码中文字幕| 国产日产精品久久久久快鸭| 中文国产不卡一区二区| 国产激情艳情在线看视频| 三年片免费观看国语电影| 天天影视色香欲综合久久| 风韵丰满妇啪啪区老老熟女杏吧 | 国产欧美日韩精品丝袜高跟鞋| 精产一二三产区m553| 欧美与黑人午夜性猛交久久久| 国产成人福利av一区二区三区| 在线高清亚洲精品二区| 抽搐一进一出试看60秒体验区| 91成人在线免费观看| 国产午夜精品鲁丝片| 国产人妻人伦精品无码麻豆| 欧美孕妇xxxx做受欧美88| 国产精品乱码久久久久久小说| 国产欧美日韩视频一区二区三区| 日本亚洲成人中文字幕| 免费国产裸体美女视频全黄|